Is the due date realistic?
Looks usable13 days remain based on the listed due date. Still confirm timezone and submission method.
Decision Header
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA4625 509 CONS CC | DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA4625 509 CONS CC
Due date
2026-08-26
NAICS
237310
PSC
Y1BD
Set-Aside
Small Business Set Aside - Total
Opportunity Type
Combined Synopsis/Solicitation
Contract Type
Construction
This appears to be a construction requirement for project scope: of Airfield Pavements contract at Whiteman AFB, MO, as defined in the Statement of Work (Base year and 4 one-year options); period/timing: and 4 one-year options).
Documents found, processing pending. Some details may improve after download and text extraction finish.
SAM.gov description
View original on SAM.govDescription source: SAM description
Amendment 2 10 Aug 26 Upload correct Attach 1 - SOW Airfield Pavement 4 Aug 2026 End Amend 2 ------------------------------------------------------------------------------------------------------- Amendment 1 04 Aug 26 Remove and replace the following Attachements: Attach 1 - SOW Airfield Pavement 15 July 2026 with SOW Airfield Pavement 4 Aug 2026 Attach 8 - Airfield Pavements Bid Schedule with Updated Airfield Pavements Bid Schedule Attach 9 - SOW 1157746 Repair Airfield Spalling DV Ramp 15 July 2026 with SOW Taxiway Golf 4 Aug 2026 Additionally, the Combo Synopsis Solicitation document was updated to reflect the changes in red. There will be no extension. End Amend 1 ------------------------------------------------------------------------------------------------------- This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The contractor shall develop and compile task order proposals based on data and information received from the Government but shall independently verify quantities. Work will consist of a broad range of maintenance, repair, and construction of runway and airfield pavements on Whiteman Air Force Base (WAFB). Please see full solicitation details at attachments.
Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.
Project scope
Confirmedof Airfield Pavements contract at Whiteman AFB, MO, as defined in the Statement of Work (Base year and 4 one-year options)
Quantity
Not foundNot found in processed sources.
Quantity may not apply to this contract type.
PN / NSN / model
Not foundNot found in processed sources.
Product identifiers may not apply to this contract type.
Site / location
ConfirmedWhiteman Air Force Base, MO
Period of performance
Needs reviewNot found in processed sources.
Submission deadlines are kept separate from delivery or performance timing.
Submission method
Needs reviewNot clearly extracted yet. Confirm the official submission method before responding.
Required forms
ConfirmedCertification requirement mentioned
Pricing / CLIN structure
Not foundNot found in processed sources.
Wage / compliance signals
Not foundNo specific wage, labor, cyber, or CMMC signal detected from processed sources.
Restrictions
Not foundNo specific restriction language detected from processed sources.
Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.
13 days remain based on the listed due date. Still confirm timezone and submission method.
mobile obstacles on an apron/ramp and taxiway
NAICS 237310 / PSC Y1BD
Set-aside listed: Small Business Set Aside - Total. Confirm your business actually qualifies before bidding.
1 attachment(s) need manual verification. Review the official source and any failed document notices before relying on extracted facts.
Submission instructions were not clearly detected. Review the official solicitation before deciding.
Security clearance may be required.
Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.
GovWerk processed readable document text where available. Treat extracted facts as a guide and confirm details in the official files.
GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.
Posted date
2026-08-10
Response deadline
2026-08-26
Due date
2026-08-26
Archive / status
2026-09-10
Always confirm the exact deadline, timezone, and submission method in the solicitation documents.
Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.
What industry is this?
NAICS 237310: Title not loaded
NAICS plain-English explanation
Not loaded yet
SBA size standard
Not loaded yet
What is the government buying?
PSC Y1BD: Title not loaded
PSC plain-English explanation
Not loaded yet
Who can compete?
Small Business Set Aside - Total
When is it due?
2026-08-26
Posted date
2026-08-10
Contact info
509 CONS/PKA | 509CONS.PKA.Construction@us.af.mil
No SBA size standard is loaded for this NAICS code yet.
Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.
be valid for a period of 180 days
medium confidenceFA462526Q1062_Combo_Synopsis_Solicitation.pdf
a written solicitation will not be issued. Solicitation FA462526Q1062 is being issued as a Request for Quote (RFQ). All quotes shall be valid for a period of 180 days. 1.2 The RFQ document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular
be provided through email to the following address: 509CONS
medium confidenceFA462526Q1062_Combo_Synopsis_Solicitation.pdf
ollowing email address: 509CONS.PKA.Construction@us.af.mil RFQ due date: 26 August 2026 RFQ due time: 1400 Central Time Quotes shall be provided through email to the following address: 509CONS.PKA.Construction@us.af.mil In the event quote attachments exceed 10 MB, offerors shall request a DoD SAFE drop off from
be submitted electronically to 509CONS
medium confidenceFA462526Q1062_Combo_Synopsis_Solicitation.pdf
age 2 of 5 Your response to this solicitation must be a comprehensive quote that is valid for a period of 180 days. All quotes must be submitted electronically to 509CONS.PKA.Construction@us.af.mil by the date and time specified in this solicitation. Please structure your submission in two
representations and certifications
high confidenceAttach_7_-_Provisions_and_Clauses.pdf
stem, or as critical technology as part of any system, unless a waiver is granted. (d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunication
These are calm decision prompts, not a final recommendation. Verify any risk before acting.
Profile match
Score this opportunity from a profile to see match reasoning.
Broker fit
Poor Broker Fit (30/100)
Information quality
56%
Attachment processing incomplete
Attachment coverage is partial. Some details may still be missing from unprocessed documents.
SBA size standard warning
No SBA size standard is loaded for this NAICS code yet.
Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.
Description
AvailableDescription available when shown above
Documents
Pending1 document(s) need manual verification
Extracted requirements
PendingInterpretation or extraction may still improve
Similar awards
PendingSimilar awards not available yet
These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.
Detected signal: PWS / SOW / SOO / Section L / Section M / attachments
The important instructions, evaluation rules, and performance requirements are often buried in solicitation sections and attachments.
Detected signal: Evaluation factors or proposal-heavy language
Proposal-heavy opportunities require a compliant, evaluatable response rather than a generic company write-up.
Detected signal: CLINs, pricing workbook, options, or price realism
Pricing mistakes can erase margin, create compliance risk, or make an otherwise strong bid noncompetitive.
Detected signal: CMMC, CUI, FCI, DFARS, NIST, or SPRS
Cybersecurity terms may create gating requirements that must be understood before bidding.
Detected signal: Vehicle-limited, teaming, or subcontracting language
Some opportunities are better approached as a subcontractor or teaming partner instead of prime contractor.
Detected signal: WAWF, PIEE, payment complexity, or upfront-cost signal
Cash flow and payment mechanics can decide whether a contract is realistic even when the work itself looks simple.
Open this section to load details.