Private BetaThis platform is in private beta. Data is source-backed where possible, but always verify official documents before bidding.

Decision Header

Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut

Contract ID: N4008526R0004

DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC MID-ATLANTIC.NAVFACSYSCOM MID-ATLANTIC | DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC MID-ATLANTIC.NAVFACSYSCOM MID-ATLANTIC

Due date

2026-09-01

NAICS

237990

PSC

Y1EA

Set-Aside

Not listed

Opportunity Type

Solicitation

Contract Type

Construction

Quick Summary

This is categorized as construction, but the processed sources do not yet provide a clean requirement summary. Review the official solicitation documents before deciding whether to pursue it.

Documents found, processing pending. Some details may improve after download and text extraction finish.

SAM.gov description

View original on SAM.gov

Description source: raw JSON

Hide full description

DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC MID-ATLANTIC.NAVFACSYSCOM MID-ATLANTIC

What They Need

Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.

Project scope

Confirmed

Mod service contracts for Phone/Utilities/ Custodial/Grounds NMCI Installations or other networks GFE status/delivery schedule (GFCI, GFGI) Client provided equipment SELF installed Client provided equipment KTR installed

From attachment text

Quantity

Not found

Not found in processed sources.

Quantity may not apply to this contract type.

PN / NSN / model

Not found

Not found in processed sources.

Product identifiers may not apply to this contract type.

Site / location

Needs review

Not found in processed sources.

Agency office addresses and clause fragments are not treated as confirmed delivery locations.

Period of performance

Needs review

Not found in processed sources.

Submission deadlines are kept separate from delivery or performance timing.

Submission method

Needs review

Not clearly extracted yet. Confirm the official submission method before responding.

Required forms

Not found

Not found in processed sources.

Pricing / CLIN structure

Not found

Not found in processed sources.

Wage / compliance signals

Not found

No specific wage, labor, cyber, or CMMC signal detected from processed sources.

Restrictions

Not found

No specific restriction language detected from processed sources.

Information still pending or needing verification

  • site/location: Attachment sources exist, but not all documents were downloaded and extracted.

Guided Bid / No-Bid Checklist

Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.

2 to review

Is the due date realistic?

Looks usable

18 days remain based on the listed due date. Still confirm timezone and submission method.

Do I understand what they need?

Missing

GovWerk does not yet have a concise requirement summary. Review the solicitation and attachments before deciding.

Do the NAICS / PSC codes make sense?

Looks usable

NAICS 237990 / PSC Y1EA

Can I compete under the set-aside?

Looks usable

No set-aside is listed in the current record. Confirm on the official solicitation.

Are documents processed?

Looks usable

17 attachment(s) need manual verification. Review the official source and any failed document notices before relying on extracted facts.

Are submission instructions clear?

Review

Submission instructions were not clearly detected. Review the official solicitation before deciding.

What risks or missing information matter?

Looks usable

No specific risk or missing-information item is surfaced yet. Still verify requirements in source documents.

What should I do next?

  1. Confirm delivery or performance location because it is not cleanly extracted yet.
  2. Confirm the submission email or portal, deadline, and required file format in the solicitation.
  3. Wait for remaining attachments to process, or manually review the official files before making a final bid decision.
  4. Open the official solicitation/source documents before bidding.
  5. Check amendments first and verify whether quantities, due dates, or requirements changed.
  6. Confirm the delivery or performance location before deciding shipping, staffing, or site feasibility.
  7. Confirm the submission method, recipient, deadline, and timezone in the solicitation.
Documents and Attachments

Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.

GovWerk processed readable document text where available. Treat extracted facts as a guide and confirm details in the official files.

GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.

Key Dates

Posted date

2026-08-03

Response deadline

2026-09-01

Due date

2026-09-01

Archive / status

2027-01-31

Always confirm the exact deadline, timezone, and submission method in the solicitation documents.

NAICS / PSC / Codes

Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.

What industry is this?

NAICS 237990: Title not loaded

NAICS plain-English explanation

Not loaded yet

SBA size standard

Not loaded yet

What is the government buying?

PSC Y1EA: Title not loaded

PSC plain-English explanation

Not loaded yet

Who can compete?

Not listed

When is it due?

2026-09-01

Posted date

2026-08-03

Contact info

ANGELA CLIFTON | angela.j.clifton2.civ@us.navy.mil

Small Business Qualification

No SBA size standard is loaded for this NAICS code yet.

Submission Instructions

Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.

 Proposal Manager View Offers  Proposal Manager  Proposal View Only Posts Offer Revision  Proposal Manager The Roles and Functions Matrix provides a depiction of the Menu Items available for each vendor role

medium confidence

Attachment_B_-_PIEE_Vendor_Access_Instructions.pdf

Matrix The Roles and Actions Matrix provides a depiction of the available actions for each vendor role. Action Role(s) Submit Offers  Proposal Manager View Offers  Proposal Manager  Proposal View Only Posts Offer Revision  Proposal Manager The Roles and Functions Matrix provides a depiction of the Menu Items available for each vendor role. Menu Item Role(s) Create Unsolicited Proposal  Proposal Manager Search  Proposal Manager  Proposal View Only Lookup

SF 30

high confidence

N4008526R00040002_SF_30.pdf

by GSA FAR (48 CFR) 53.243 Created On: 16 Mar 2026, 16:10 PM Greenwich Mean Time N4008526R00040002 Page 2 of 11 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Section 00 40 00 - Procurement Forms and Supplements Miscellaneous text i

SF 30

high confidence

N4008526R00040005_SF_30.pdf

n unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243 N4008526R00040005 Page 2 of 10 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Block 14 (Description of Amendment/Modification): N40085-26-R-0004, Desig

SF30

high confidence

N4008526R00040005_SF_30.pdf

onditions The following attachments were added: Amendment 0005 Continuation Page N4008526R00040005 Page 3 of 10 SECTION SF30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES The following have been added by full text: AMENDMENT 0005 This amendment

SF 30

high confidence

N4008526R00040003_SF_30.pdf

by GSA FAR (48 CFR) 53.243 Created On: 06 Apr 2026, 19:54 PM Greenwich Mean Time N4008526R00040003 Page 2 of 2 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Section 00 50 00 - Contracting Forms and Supplements Miscellaneous text i

SF 30

high confidence

Amendment_N4008526R00040004_SF_30.pdf

on unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243 N4008526R00040004 Page 2 of 3 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Section 00 00 00 - Procurement and Contracting Requirements The following

SF 30

high confidence

N4008526R00040001_SF_30.pdf

n unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243 N4008526R00040001 Page 2 of 15 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Section 00 30 00 - Available Information Miscellaneous text in this secti

SF 30

high confidence

N4008526R00040007_SF_30.pdf

by GSA FAR (48 CFR) 53.243 Created On: 23 Jun 2026, 17:48 PM Greenwich Mean Time N4008526R00040007 Page 2 of 46 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Block 14 (Description of Amendment/Modification): N40085-26-R-0004, Desig

Bid / No-Bid Factors

These are calm decision prompts, not a final recommendation. Verify any risk before acting.

Profile match

Score this opportunity from a profile to see match reasoning.

Broker fit

Not scored yet

Information quality

18%

Attachment processing incomplete

Attachment coverage is partial. Some details may still be missing from unprocessed documents.

SBA size standard warning

No SBA size standard is loaded for this NAICS code yet.

Source / Verification Notes

Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.

Description

Available

Description available when shown above

Documents

Pending

17 document(s) need manual verification

Extracted requirements

Pending

Interpretation or extraction may still improve

Similar awards

Pending

Similar awards not available yet

Learn Before You Bid

These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.

Similar awards

Open this section to load details.

Build dc4dc88
Commit
dc4dc88c3354ae724c7b9f3048fd1116d64c393f
Ref
main
Env
production
Built
2026-08-14T01:40:47.864Z
App
not set