Private BetaThis platform is in private beta. Data is source-backed where possible, but always verify official documents before bidding.

Decision Header

Low-Voltage Switchgear with Integrated ATS

Contract ID: 383921kmb

ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR | ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR

Due date

2026-08-18

NAICS

335313

PSC

6110

Set-Aside

Not listed

Opportunity Type

Solicitation

Contract Type

Product Supply

Quick Summary

The exact requirement is not clear from confirmed source text and needs review. Possible clues are shown below and should be reviewed before relying on them.

Documents found, processing pending. Some details may improve after download and text extraction finish.

SAM.gov description

View original on SAM.gov

Description source: SAM description

Hide full description

Fermilab is seeking to procure low-voltage switchgear with integrated ATS. Please see attached Fermilab RFP 383921kmb and associated documentation. Please review the RFP document fully, as it outlines how to submit a complete proposal package. Important information related to this RFP: Proposal Due Date: 5:00 PM CT, Tuesday, August 18, 2026 Proposals must be submitted with a completed SARC (if not completed within the last year), PUR-466, and Questionnaire – 383921kmb

What They Need

Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.

Item / service / scope

Needs review

Not found in processed sources.

If the requirement package has not been fully processed, this may improve after attachment extraction.

Quantity

Needs review

Not found in processed sources.

PN / NSN / model

Needs review

Not found in processed sources.

Delivery / performance location

Confirmed

Batavia, IL

From attachment text

Delivery deadline / period

Needs review

Not found in processed sources.

Submission deadlines are kept separate from delivery or performance timing.

Submission method

Needs review

Not clearly extracted yet. Confirm the official submission method before responding.

Required forms

Confirmed

Certification requirement mentioned

Pricing / CLIN structure

Not found

Not found in processed sources.

Wage / compliance signals

Not found

No specific wage, labor, cyber, or CMMC signal detected from processed sources.

Restrictions

Not found

No specific restriction language detected from processed sources.

Information still pending or needing verification

  • item/product: Attachment sources exist, but not all documents were downloaded and extracted.
  • quantity: Attachment sources exist, but not all documents were downloaded and extracted.
  • PN/NSN/model/manufacturer: Attachment sources exist, but not all documents were downloaded and extracted.

Guided Bid / No-Bid Checklist

Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.

3 to review

Is the due date realistic?

Review

4 days left. Confirm submission method, timezone, and whether a complete response is realistic.

Do I understand what they need?

Looks usable

data (as defined in the clause at 52

Do the NAICS / PSC codes make sense?

Looks usable

NAICS 335313 / PSC 6110

Can I compete under the set-aside?

Looks usable

No set-aside is listed in the current record. Confirm on the official solicitation.

Are documents processed?

Looks usable

4 attachment(s) had readable text extracted and 5 downloaded. Review extracted facts against official documents.

Are submission instructions clear?

Review

Submission instructions were not clearly detected. Review the official solicitation before deciding.

What risks or missing information matter?

Review

Security clearance may be required.

What should I do next?

  1. Confirm delivery or performance location because it is not cleanly extracted yet.
  2. Confirm the submission email or portal, deadline, and required file format in the solicitation.
  3. Wait for remaining attachments to process, or manually review the official files before making a final bid decision.
  4. Open the official solicitation/source documents before bidding.
  5. Check amendments first and verify whether quantities, due dates, or requirements changed.
  6. Confirm PN, NSN, model, manufacturer, or approved-source details in the solicitation documents.
  7. Confirm the quantity and unit of issue before contacting suppliers or pricing the item.
Documents and Attachments

Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.

GovWerk processed readable document text where available. Treat extracted facts as a guide and confirm details in the official files.

GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.

Key Dates

Posted date

2026-08-03

Response deadline

2026-08-18

Due date

2026-08-18

Archive / status

2026-09-02

Always confirm the exact deadline, timezone, and submission method in the solicitation documents.

NAICS / PSC / Codes

Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.

What industry is this?

NAICS 335313: Title not loaded

NAICS plain-English explanation

Not loaded yet

SBA size standard

Not loaded yet

What is the government buying?

PSC 6110: Title not loaded

PSC plain-English explanation

Not loaded yet

Who can compete?

Not listed

When is it due?

2026-08-18

Posted date

2026-08-03

Contact info

Karen Berger | kberger@fnal.gov

Small Business Qualification

No SBA size standard is loaded for this NAICS code yet.

Submission Instructions

Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.

be submitted by 5:00 PM CT August 18, 2026

medium confidence

RFP-383921kmb.pdf

turned with your proposal: SARC - Subcontractor Annual Reps & Certs (Rev. 8) PUR-466 - Proposal Certifications (Rev. 5) Proposals shall be submitted by 5:00 PM CT August 18, 2026. The RFP response shall include a completed RFP page, SARC Form (if not completed in the last year), PUR-466 Form, and

W-9

high confidence

SARC_Subcontractor_Annual_RepsCerts_Rev_8_2_.pdf

ION: ANY COMPANY NAME OR ADDRESS CHANGE NOTIFICATIONS MUST BE PROVIDED ON COMPANY LETTERHEAD. A CURRENT IRS FORM W-8 OR W-9 IS REQUIRED FOR COMPANY NAME CHANGES. The procurement of material, supplies, or services (including construction) for a

Bid / No-Bid Factors

These are calm decision prompts, not a final recommendation. Verify any risk before acting.

Profile match

Score this opportunity from a profile to see match reasoning.

Broker fit

Possible Broker Fit - needs review (50/100)

Information quality

61%

Attachment processing incomplete

Attachment coverage is partial. Some details may still be missing from unprocessed documents.

SBA size standard warning

No SBA size standard is loaded for this NAICS code yet.

Quantity not confirmed

This appears product-related, but the processed data did not confirm the quantity. Check attachments before pricing.

Source / Verification Notes

Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.

Description

Available

Description available when shown above

Documents

Pending

4 document(s) had readable text extracted

Extracted requirements

Pending

Interpretation or extraction may still improve

Similar awards

Pending

Similar awards not available yet

Learn Before You Bid

These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.

Similar awards

Open this section to load details.

Build dc4dc88
Commit
dc4dc88c3354ae724c7b9f3048fd1116d64c393f
Ref
main
Env
production
Built
2026-08-13T23:30:43.412Z
App
not set