Is the due date realistic?
Looks usable10 days remain based on the listed due date. Still confirm timezone and submission method.
Decision Header
TRANSPORTATION, DEPARTMENT OF.MARITIME ADMINISTRATION.6933A2 DOT MARITIME ADMINISTRATION | TRANSPORTATION, DEPARTMENT OF.MARITIME ADMINISTRATION.6933A2 DOT MARITIME ADMINISTRATION
Due date
2026-08-24
NAICS
237990
PSC
Z2QA
Set-Aside
Small Business Set Aside - Total
Opportunity Type
Combined Synopsis/Solicitation
Contract Type
Construction
acceptance those items that conform to the requirements of this contract
Documents found, processing pending. Some details may improve after download and text extraction finish.
SAM.gov description
View original on SAM.govDescription source: SAM description
The Maritime Administation contemplates award of a firm fixed price contract for industrial support to demolish and dispose degraded decking and uneven walkway framing of the existing trestle pier, preserve existing structural pilings, and reconstruct the pier using new framing and decking materials of a similar size profile to include handrails on steps at the James River Reserve Fleet (JRRF) shore facilities onboard Fort Eustis base compound in accordance with the Statement of Work. This combined synopsis/solicitation is published as a Total Small Business Set-Aside. Amendment 0001 is issued to correct JRRF POC Email address. Please see attached SF-30.
Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.
Project scope
Confirmednew structural framing (joists, headers, and blocking) onto the existing pilings
Quantity
Not foundNot found in processed sources.
Quantity may not apply to this contract type.
PN / NSN / model
Not foundNot found in processed sources.
Product identifiers may not apply to this contract type.
Site / location
ConfirmedFort Eustis, VA
Period of performance
Needs reviewNot found in processed sources.
Submission deadlines are kept separate from delivery or performance timing.
Submission method
Needs reviewNot clearly extracted yet. Confirm the official submission method before responding.
Required forms
Not foundNot found in processed sources.
Pricing / CLIN structure
Not foundNot found in processed sources.
Wage / compliance signals
Not foundNo specific wage, labor, cyber, or CMMC signal detected from processed sources.
Restrictions
Not foundNo specific restriction language detected from processed sources.
Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.
10 days remain based on the listed due date. Still confirm timezone and submission method.
acceptance those items that conform to the requirements of this contract
NAICS 237990 / PSC Z2QA
Set-aside listed: Small Business Set Aside - Total. Confirm your business actually qualifies before bidding.
4 attachment(s) had readable text extracted and 4 downloaded. Review extracted facts against official documents.
Submission instructions were not clearly detected. Review the official solicitation before deciding.
Construction bonding or site work may be required.
Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.
GovWerk processed readable document text where available. Treat extracted facts as a guide and confirm details in the official files.
GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.
Posted date
2026-08-03
Response deadline
2026-08-24
Due date
2026-08-24
Archive / status
2026-08-26
Always confirm the exact deadline, timezone, and submission method in the solicitation documents.
Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.
What industry is this?
NAICS 237990: Title not loaded
NAICS plain-English explanation
Not loaded yet
SBA size standard
Not loaded yet
What is the government buying?
PSC Z2QA: Title not loaded
PSC plain-English explanation
Not loaded yet
Who can compete?
Small Business Set Aside - Total
When is it due?
2026-08-24
Posted date
2026-08-03
Contact info
Wile, William | william.wile@dot.gov
No SBA size standard is loaded for this NAICS code yet.
Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.
be received no later than 24 August 2026 at 2:00PM EDT via email
medium confidenceRFQ_6933A226Q000015_JRRF_Trestle_Pier_Repair.pdf
sponses to questions received prior to the deadline will be posted via an amendment to this solicitation. Submission of quotes shall be received no later than 24 August 2026 at 2:00PM EDT via email. All quotations shall be delivered via email to W. Alan Wile at william.wile@dot.gov. 1. SOW Intent Contractor to demol
Representations and Certifications
high confidenceRFQ_6933A226Q000015_JRRF_Trestle_Pier_Repair.pdf
otice of Buy American Requirements – Construction Materials (May 2014) 52.240-90 S ecurity, Prohibitions and Exclusions Representations and Certifications (Sep 2025) PROVISIONS BY FULL TEXT 52.216-1 Type of Contract (Apr 1984) The Government contemplates award of a firm fix
These are calm decision prompts, not a final recommendation. Verify any risk before acting.
Profile match
Score this opportunity from a profile to see match reasoning.
Broker fit
Poor Broker Fit (40/100)
Information quality
65%
SBA size standard warning
No SBA size standard is loaded for this NAICS code yet.
Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.
Description
AvailableDescription available when shown above
Documents
Pending4 document(s) had readable text extracted
Extracted requirements
PendingInterpretation or extraction may still improve
Similar awards
PendingSimilar awards not available yet
These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.
Detected signal: PWS / SOW / SOO / Section L / Section M / attachments
The important instructions, evaluation rules, and performance requirements are often buried in solicitation sections and attachments.
Detected signal: CLINs, pricing workbook, options, or price realism
Pricing mistakes can erase margin, create compliance risk, or make an otherwise strong bid noncompetitive.
Detected signal: Wage determination, SCA, Davis-Bacon, or certified payroll
Labor rules can materially change pricing, payroll, recordkeeping, and performance obligations.
Detected signal: Vehicle-limited, teaming, or subcontracting language
Some opportunities are better approached as a subcontractor or teaming partner instead of prime contractor.
Detected signal: WAWF, PIEE, payment complexity, or upfront-cost signal
Cash flow and payment mechanics can decide whether a contract is realistic even when the work itself looks simple.
Detected signal: Industry-specific requirement language
Industry-specific contracts have different proof needs, pricing drivers, red flags, and performance risks.
Open this section to load details.