Is the due date realistic?
Looks usable13 days remain based on the listed due date. Still confirm timezone and submission method.
Decision Header
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA | DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
Due date
2026-08-27
NAICS
238210
PSC
Z2AA
Set-Aside
Small Business Set Aside - Total
Opportunity Type
Combined Synopsis/Solicitation
Contract Type
Construction
The exact requirement is not clear from confirmed source text and needs review. Possible clues are shown below and should be reviewed before relying on them.
Documents found, processing pending. Some details may improve after download and text extraction finish.
SAM.gov description
View original on SAM.govDescription source: SAM description
The Army Contracting Command - New Jersey, on behalf of the 99th Readiness Division has Construction Project Upgrade Existing Lighting to LED (MD040) at the 2118 Annapolis Rd., Fort Meade, MD 20755-7074. The purpose of this project is to modernize Training Building 2118, Organizational Maintenance Shop (OMS) 2121, Storage Building 2119 and the Unheated Storage Building (UHS) 2122 by upgrading the entire lighting systems to energy-efficient and long-lasting Light Emitting Diode (LED) technology, thereby improving both operational efficiency and the learning environment. The period of performance is 120 Calendar Days from the Notice to Proceed Date.
Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.
Project scope
Needs reviewNot found in processed sources.
If the requirement package has not been fully processed, this may improve after attachment extraction.
Quantity
Not foundNot found in processed sources.
Quantity may not apply to this contract type.
PN / NSN / model
Not foundNot found in processed sources.
Product identifiers may not apply to this contract type.
Site / location
Needs reviewNot found in processed sources.
Agency office addresses and clause fragments are not treated as confirmed delivery locations.
Period of performance
Needs reviewNot found in processed sources.
Submission deadlines are kept separate from delivery or performance timing.
Submission method
Needs reviewNot clearly extracted yet. Confirm the official submission method before responding.
Required forms
Not foundNot found in processed sources.
Pricing / CLIN structure
Not foundNot found in processed sources.
Wage / compliance signals
Not foundNo specific wage, labor, cyber, or CMMC signal detected from processed sources.
Restrictions
Not foundNo specific restriction language detected from processed sources.
Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.
13 days remain based on the listed due date. Still confirm timezone and submission method.
This appears to be a construction-related requirement, but the exact item is not clearly identified. The available text suggests repair, modification, installation, custom work, or specialized service may be involved....
NAICS 238210 / PSC Z2AA
Set-aside listed: Small Business Set Aside - Total. Confirm your business actually qualifies before bidding.
Some document source(s) are pending extraction. Review attachments before final bid/no-bid.
Submission instructions were not clearly detected. Review the official solicitation before deciding.
Construction bonding or site work may be required.
Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.
Documents or links were found, but extraction is still pending for at least some files. Important details may still be missing.
GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.
Posted date
2026-07-28
Response deadline
2026-08-27
Due date
2026-08-27
Archive / status
2026-09-30
Always confirm the exact deadline, timezone, and submission method in the solicitation documents.
Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.
What industry is this?
NAICS 238210: Title not loaded
NAICS plain-English explanation
Not loaded yet
SBA size standard
Not loaded yet
What is the government buying?
PSC Z2AA: Title not loaded
PSC plain-English explanation
Not loaded yet
Who can compete?
Small Business Set Aside - Total
When is it due?
2026-08-27
Posted date
2026-07-28
Contact info
Jonathan Krakower | jonathan.p.krakower.civ@army.mil
No SBA size standard is loaded for this NAICS code yet.
Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.
Quote submission instructions were not clearly extracted. Review the original solicitation and attachments before responding.
These are calm decision prompts, not a final recommendation. Verify any risk before acting.
Profile match
Score this opportunity from a profile to see match reasoning.
Broker fit
Poor Broker Fit (0/100)
Information quality
26%
Attachment processing incomplete
Attachment sources may exist, but the system has not confirmed downloadable files yet.
SBA size standard warning
No SBA size standard is loaded for this NAICS code yet.
Submission instructions not clearly extracted
The system did not clearly extract where or how to submit a quote. Confirm instructions in SAM.gov or attachments.
Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.
Description
AvailableDescription available when shown above
Documents
PendingDocuments found, processing pending
Extracted requirements
PendingInterpretation or extraction may still improve
Similar awards
PendingSimilar awards not available yet
These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.
Detected signal: Sources Sought / RFI
Early market research notices are often your best chance to shape requirements before a formal solicitation is released.
Detected signal: PWS / SOW / SOO / Section L / Section M / attachments
The important instructions, evaluation rules, and performance requirements are often buried in solicitation sections and attachments.
Detected signal: Industry-specific requirement language
Industry-specific contracts have different proof needs, pricing drivers, red flags, and performance risks.
Open this section to load details.